After studying the section, students should :
know:
be able to:
own:
CONTENTS OF SECTION
Chapter 11. Construction work, processes and operations during reconstruction and restoration
11.1. Construction work, processes and operations during reconstruction and restoration
11.2. Dismantling
11.3. Technology work in cramped conditions
11.4. Features of installation of steel structures. Sandwich Panel Mounting Technology
Tasks
1. Make a photo of the dismantling of the attic.
2. Make a photo of the dismantling of the walls of the old building.
3. To develop a construction general layout of an attic device in cramped conditions.
4. Evaluate the effectiveness of sandwich panels during reconstruction.
5. Develop a business plan for the installation of the attic.
Exercises
1. Develop a map of work processes when dismantling masonry.
2. To draw a master plan of the site of reconstruction.
3. Assess the advantages of the vertical layout of your site.
4. Make a budget for waterproofing.
5. Make a waterproofing business plan.
test questions
1. What is a complex reconstruction?
2. What is tamponage?
3. Why do we need a vertical layout?
4. What is drainage?
5. What is metal insulation?
Recommended literature
1. Akimova L. D., Amosov N. G. and others. The technology of construction production. Textbook / Under ed. Gm Badina and A.V. Meshchaninov. - L .: Stroyizdat, 1987.
2. Asaul A.N., Kazakov Yu.N. and others. Pre-fabricated buildings and structures. Scientific and educational handbook. - SPb .: Humanistic, 2004.
3. Afanasyev A.A., Danilov N.N. and others. The technology of construction processes. Textbook - M .: Higher School, 1997.
4. Podyapolsky S.S., Bessonov G.B. and others. Restoration of architectural monuments. Tutorial. - M .: stroiizdat, 2000.
5. Shepelev N.P. Reconstruction of urban development. Textbook. - M .: Higher School, 2000.
Что бы оставить комментарий войдите
Комментарии (0)