PRODUCTION OF ROOFING AND PROTECTIVE WORKS 6. Components required for the installation of roofing materials. conclusion

  PRODUCTION OF ROOFING AND PROTECTIVE WORKS 6. Components required for the installation of roofing materials.  conclusion

And in conclusion about those components that will be needed when installing the roof . These are suspended gutters, brackets and plugs for them, funnels, drain pipes, brackets and elbows for them, and besides, ridge, end and ledge strips, fastenings of pipes, antennas and much more. The cost of components can be 30-40% of the cost of roofing material .

For the roofing of soft tiles, in addition to ordinary tiles, various additional and component elements are also required. These are curtain strips, ridge elements (with ventilation holes), ventilation pipes, vacuum fans (to optimize the ventilation of the roof structure or the upper floor), roll materials for the lower carpet, roofing nails or hooks, etc.

Typically, manufacturers of soft tile have special tables with an approximate consumption of components, depending on the area and the slope of the roof.

7. Conclusion.

When choosing a roofing material, the designer or architect should clearly understand the purpose of the building (residential, public, auxiliary, etc.), the desired durability of the building itself and the roofing, as well as the roof configuration dictated by aesthetic and utilitarian (for example, the desire to have additional space ) considerations.

The criteria for selecting a specific roofing material in this case will be:

  • compliance of the roof configuration material;
  • compliance with the durability of the material planned durability of the roof and, in particular, the building as a whole;
  • material compliance with aesthetic requirements;
  • the conformity of the material with the economic possibilities of the developer (here the cost of the material, the complexity of its installation and the complexity of the roof construction: rafters, lathing, durability and laboriousness of repair work) are assessed.