1) Work production log:
- general;
- on water lowering;
- for earthworks in the winter;
- on pile driving;
- concreting during the construction of structures using the “wall in the ground” method;
- installation of prefabricated RC structures;
- welding of precast concrete structures;
- on corrosion protection of welded joints of precast concrete;
- concreting of joints of parts of precast concrete;
- concrete works on monolithic structures;
- stone works erected in winter;
- maintenance of concrete monolithic structures;
- protective wood processing;
- protective wood processing;
- on anticorrosive protection of building structures.
2) Executive working drawings;
3) Acts:
- examination of hidden works;
- intermediate acceptance of individual critical structures;
- individual testing of mounted equipment;
- on testing of technical equipment, water supply systems, sewage systems, gas supply, heating, ventilation, external networks and water supply facilities, sewage systems, drainage devices, as well as testing of welded joints;
- on the implementation of the sealing of inputs and releases of engineering communications in places of passage through the underground parts of the outer walls of buildings in accordance with the design and estimate documentation;
- about testing external and internal installations of electrical networks;
- about testing devices that provide fire and explosion safety and lightning protection.