Preparation of the assignment for design and survey works

  Preparation of the assignment for design and survey works

1. Basis for design

2. Type of construction

3. Stage

4. Requirements for alternative and competitive development

5. Special requirements

6. Major TEC, including power performance

7. Requirements for the quality of competitiveness and environmental parameters of products

8. Requirements for technology, enterprise mode

9. Requirements for architectural and construction, space-planning and design solutions

10. Selection of queues and start-up complexes, requirements for the development prospects of the enterprise

11. Requirements and conditions for the development of environmental measures and measures

12. Requirements for safety and health

13. Requirements for the assimilation of production

14. Requirements for civil defense and emergency situations

15. Requirements for the implementation of experimental design and research work

16. Composition of the demonstration materials

17. The number of copies of the design and estimate documentation

The design and estimate documentation is prepared in five copies, incl. one archive. Constructive, economic and other calculations to the customer are not issued, are stored in one copy. The design assignment is approved by the investor.

There is a summary estimate:

- estimates for survey work

- estimates at a price

- estimates in the form of ZP

Срп (п) = С * к1 (2)

Срп (п) - the cost of developing a working draft or project

C - the cost of the development of working documentation for 2-stage design

K1 - the ratio of the cost of the working project (including taxiways) to the cost of working documentation

K2 - the ratio of the project cost to the cost of the development of working documentation

C = a + bx

a , b - constant values ​​for determining the interval of the main indicator of the designed object

x - the main indicator of the designed object

a , b , k1, k2 - in the sections of the collection