In order to manage the project activity, a sequence of operations is constructed, covering the entire creative cycle.
Scheme 5 . Sequence chart
(Diagram 5).
Architectural and design activity is disclosed as a set of interrelated operations, located in the necessary for the development of a sequence, in the relationship of empirical and logical processes. In a schematic network built on the basis of a graph, distinguish the operations of the upper zone, which constitute the sphere of the creative process, and the operations of the lower zone, which constitute the sphere of scientific research. Thus, the method of managing design modeling consists in combining cognitive and creative operations. Creative activity takes place in time and is characterized by a certain sequence of actions - a strategy. The strategy of the project action at the stages, levels and stages of modeling becomes different. Thus, the strategy of transforming the main three stages is consistent. A student, having received a recommendation from the teacher at each of the stages, “what to do”, performs the corresponding stage.
Activity strategy at structural levels is cyclical. Here, the student’s analysis of the results in each phase contains the question, “continue or return”. The scheme with returns to previous levels (with loops) is specific to the stage of creative search. The activity strategy on the steps is branched. In the network of design stages, “operations” from pre-project analysis and creative search are connected in parallel, alternative events need to be chosen.
Что бы оставить комментарий войдите
Комментарии (0)